CityScroll

Back to community board sources

Community board

Queens Community Board 1

A local advisory body, its district, committees, proceedings, people, and official source coverage.

Open this board’s place view · Open this board institution · Open the source directory

About this board

Positions this board recorded on land use projects

This source records no position submitted by this board on the 40 land use projects this site retains from it. That is what the source holds; it is not a record that this board has never voted on an application.

A community board's position on a land use application is advisory. The board holds a public hearing and votes on a recommendation; the City Planning Commission, and the City Council where the review reaches it, are the bodies that decide.

Source: NYC Department of City Planning, Zoning Application Portal. Observed September 9, 2026. Open the published project source

Budget requests this district made to city agencies

The city's budget register holds 75 requests this board made for fiscal year 2027, addressed to 17 agencies.

A request is what the board asked for. A response is the written answer published for it on that date. Neither is funding, a commitment or delivery, and a request with a supportive answer is not a project.

A priority number is this board's own order inside one agency and one budget type. Requests to different agencies are not on one scale, and nothing here is a citywide ranking.

6 requests carry an answer that reads differently in the later publication.

Choose an agency:

Department of Parks and Recreation

18 requests Open this agency

  • Other capital budget request for DPR 401202702CS
    Priority 01 among this board's continued support requests to this agency · Fiscal year 2027 · Location the board gave: ASTORIA PARK, Astoria, NY, USA

    Department of Parks and Recreation

    Astoria Park Erosion Control Plan- Implement Erosion Plan requires completion

    Answers published for this request

    1. Published May 12, 2026 The agency recommends funding this budget request, but at this time the availability of funds is uncertain. OMB supports the agency's position.
    2. Published June 30, 2026 The agency recommends funding this budget request, but at this time the availability of funds is uncertain. OMB supports the agency's position. This answer reads the same as the one published May 12, 2026.
  • Provide a new or expanded park or amenity (i.e. playground, outdoor athletic field) 401202707C
    Priority 01 among this board's capital requests to this agency · Fiscal year 2027 · Location the board gave: ASTORIA PARK, Astoria, NY, USA

    Department of Parks and Recreation

    Renovation of Complex Area at Astoria Park Including the Terrace & Electric upgrades and locker room renovation this space requires updating and repairs it is necessary due to the amount of use by the district and City of NY residents alike. It is know and loved City wide.

    Answers published for this request

    1. Published May 12, 2026 The agency recommends funding this budget request, but at this time the availability of funds is uncertain. OMB supports the agency's position.
    2. Published June 30, 2026 The agency recommends funding this budget request, but at this time the availability of funds is uncertain. OMB supports the agency's position. This answer reads the same as the one published May 12, 2026.
  • Improve trash removal and cleanliness 401202714E
    Priority 01 among this board's expense requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Department of Parks and Recreation

    CD1Q Parks requires funding for increased sanitation services and additional receptacles. Receptacle pick-ups require frequent pickups routinely for the health and cleanliness of our community to prevent rodents. Funding for these services is a necessity as our parks are highly utilized. Our community has increased in population, and the parks feel the impact which is visible by the overflow of receptacles which litter our parks. Our parks have multiple events each year which draw crowds and the services must match the need.

    Answers published for this request

    1. Published May 12, 2026 The agency recommends funding this budget request, but at this time the availability of funds is uncertain. OMB supports the agency's position.
    2. Published June 30, 2026 The agency recommends funding this budget request, but at this time the availability of funds is uncertain. OMB supports the agency's position. This answer reads the same as the one published May 12, 2026.
  • Reconstruct or upgrade a park or amenity (i.e. playground, outdoor athletic field) 401202703CS
    Priority 02 among this board's continued support requests to this agency · Fiscal year 2027 · Location the board gave: QUEENSBRIDGE PARK, Long Island City, NY, USA

    Department of Parks and Recreation

    Queensbridge Park Renovation: Fencing, Park Paths and the 21st Street Access require remedy and repair for an enhanced community experiance in this highly utlized park

    Answers published for this request

    1. Published May 12, 2026 The agency has stated that they will try to accommodate this request with existing resources. OMB supports this.
    2. Published June 30, 2026 The agency has stated that they will try to accommodate this request with existing resources. OMB supports this. This answer reads the same as the one published May 12, 2026.
  • Other capital budget request for DPR 401202708C
    Priority 02 among this board's capital requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Department of Parks and Recreation

    At Whitey Ford Field the surrounding housing per-capita have a multitude of dogs. Pet ownership is at its highest in Western Queens. The need for dog runs is evident, Whitey Ford Field has been requested by neighbors to have a section utilized for this purpose. Dog runs/parks provide a sense of community and allow interaction in a safe way. CD1 Q requires space for our four legged friends to utilize in a safe & controlled atmosphere. Whitey Ford Field could provide such a spot. https://www.nycgovparks.org/parks/whitey-ford-field

    Answers published for this request

    1. Published May 12, 2026 This request is not recommended for funding.
    2. Published June 30, 2026 This request is not recommended for funding. This answer reads the same as the one published May 12, 2026.
  • Provide better park maintenance 401202715E
    Priority 02 among this board's expense requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Department of Parks and Recreation

    Full time maintenance workers for CD 1 are requested to provide a better Park going experience. Our parks are being updated and we would like to have full time workers to maintain the quality of parks in our district. We would not want they return to an unkempt state after an investment in the community has been made due to a lack of personnel to care for the grounds in our boundaries. Our district is being proactive in the care of our parks. Our parks are our natural resources.

    Answers published for this request

    1. Published May 12, 2026 The agency recommends funding this budget request, but at this time the availability of funds is uncertain. OMB supports the agency's position.
    2. Published June 30, 2026 The agency recommends funding this budget request, but at this time the availability of funds is uncertain. OMB supports the agency's position. This answer reads the same as the one published May 12, 2026.
  • Reconstruct or upgrade a building in a park 401202704CS
    Priority 03 among this board's continued support requests to this agency · Fiscal year 2027 · Location the board gave: WHITEY FORD FIELD, Astoria, NY, USA

    Department of Parks and Recreation

    Whitey Ford Field: Renovate Ball Field & Create Waterfront Access for Community Use

    Answers published for this request

    1. Published May 12, 2026 This request has already been funded.
    2. Published June 30, 2026 This request has already been funded. This answer reads the same as the one published May 12, 2026.
  • Reconstruct or upgrade a park or amenity (i.e. playground, outdoor athletic field) 401202709C
    Priority 03 among this board's capital requests to this agency · Fiscal year 2027 · Location the board gave: STEINWAY PLAYGROUND, Astoria, NY, USA

    Department of Parks and Recreation

    Renovate and upgrade Steinway Playground on 37 Street and 20 Road Areas of renovation should include a basketball court renovation, garden area, and dog park.

    Answers published for this request

    1. Published May 12, 2026 The agency recommends funding this budget request, but at this time the availability of funds is uncertain. OMB supports the agency's position.
    2. Published June 30, 2026 The agency recommends funding this budget request, but at this time the availability of funds is uncertain. OMB supports the agency's position. This answer reads the same as the one published May 12, 2026.
  • Forestry services, including street tree maintenance 401202716E
    Priority 03 among this board's expense requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Department of Parks and Recreation

    Include funds for more frequent tree pruning in the budget for CD1,Q. One of the most frequent complaints that are phoned into the CD1,Q Board office are tree trim related complains such as branches hitting the roof of homes and other tree related dangers. Funding for additional trimming in CD1,Q is necessary due to the high number of older trees in our boundaries. We understand the new program however it is not enough to service our district.

    Answers published for this request

    1. Published May 12, 2026 The agency recommends funding this budget request, but at this time the availability of funds is uncertain. OMB supports the agency's position.
    2. Published June 30, 2026 The agency recommends funding this budget request, but at this time the availability of funds is uncertain. OMB supports the agency's position. This answer reads the same as the one published May 12, 2026.
  • Reconstruct or upgrade a park or amenity (i.e. playground, outdoor athletic field) 401202705CS
    Priority 04 among this board's continued support requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Department of Parks and Recreation

    Hallets Cove Playground: Repair Fence and Comfort Station, Resurface

    Answers published for this request

    1. Published May 12, 2026 The agency recommends funding this budget request, but at this time the availability of funds is uncertain. OMB supports the agency's position.
    2. Published June 30, 2026 The agency recommends funding this budget request, but at this time the availability of funds is uncertain. OMB supports the agency's position. This answer reads the same as the one published May 12, 2026.
  • Provide a new, or new expansion to, a building in a park 401202710C
    Priority 04 among this board's capital requests to this agency · Fiscal year 2027 · Location the board gave: ASTORIA PARK, Astoria, NY, USA

    Department of Parks and Recreation

    Create a New Expanded Comfort Station in the North Side of Astoria Park Closer to Ditmars Boulevard this is a Necessary Amenity. The park is highly utilized and the lack of public facilities cause a hardship to the community. When there is a need people are forced to leave our park to find a comfort station.This request needs to be addressed as soon as possible.

    Answers published for this request

    1. Published May 12, 2026 The agency recommends funding this budget request, but at this time the availability of funds is uncertain. OMB supports the agency's position.
    2. Published June 30, 2026 The agency recommends funding this budget request, but at this time the availability of funds is uncertain. OMB supports the agency's position. This answer reads the same as the one published May 12, 2026.
  • Provide better park maintenance 401202717E
    Priority 04 among this board's expense requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Department of Parks and Recreation

    Provide Community Playground Associates for Qualified Parks in CD1. Our District requires the additional personnel to interact & motivate the youth, so the existing staff are not inundated. Community programming is an essential part of our Parks for all ages. The local parks use has increased as the number of visitors and resident rise each year. Our district is having a population boom and residents consistently use our parks for multiple events throughout the seasons. Associates at the park have a multiprong effect on the community relationship with the park. They provide recreational programing, organize athletics and educational programs, maintenance and repairs. Most of all they provide a sense of security, Associates provide valuable services to the community changing the park experience for the better.

    Answers published for this request

    1. Published May 12, 2026 The agency recommends funding this budget request, but at this time the availability of funds is uncertain. OMB supports the agency's position.
    2. Published June 30, 2026 The agency recommends funding this budget request, but at this time the availability of funds is uncertain. OMB supports the agency's position. This answer reads the same as the one published May 12, 2026.
  • Reconstruct or upgrade a building in a park 401202706CS
    Priority 05 among this board's continued support requests to this agency · Fiscal year 2027 · Location the board gave: ASTORIA PARK, Astoria, NY, USA

    Department of Parks and Recreation

    Replace All Water Fountains in Astoria Park

    Answers published for this request

    1. Published May 12, 2026 The agency recommends funding this budget request, but at this time the availability of funds is uncertain. OMB supports the agency's position.
    2. Published June 30, 2026 The agency recommends funding this budget request, but at this time the availability of funds is uncertain. OMB supports the agency's position. This answer reads the same as the one published May 12, 2026.
  • New equipment for maintenance 401202711C
    Priority 05 among this board's capital requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Department of Parks and Recreation

    Astoria Height Playground is highly utilized by the community. The tennis area is extremely popular and has fallen into disrepair. These courts are an asset to our community and require renovation with upgrades. Adults and youth enjoy the access to tennis which provides beneficial health aspects such as lower blood pressure and cardiovascular impact. Bone health, muscle health weight loss and mental health are attributed to the sport of tennis. Our community utilizes the courts regularly and the repairs are necessary allow continued use and to prevent injury to our residents. https://www.nycgovparks.org/parks/astoria-heights-playground/facilities/tennis

    Answers published for this request

    1. Published May 12, 2026 The agency recommends funding this budget request, but at this time the availability of funds is uncertain. OMB supports the agency's position.
    2. Published June 30, 2026 The agency recommends funding this budget request, but at this time the availability of funds is uncertain. OMB supports the agency's position. This answer reads the same as the one published May 12, 2026.
  • Provide new type and/or specific type of program 401202718E
    Priority 05 among this board's expense requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Department of Parks and Recreation

    Winter activation of Astoria Parks Pool Area will provide outdoor use for the residents and provide community building opportunity. The activation of a winter market or ice rink will utilize a dormant spot during the winter and create a newly generated area for the community.

    Answers published for this request

    1. Published May 12, 2026 This request is not recommended for funding.
    2. Published June 30, 2026 This request is not recommended for funding. This answer reads the same as the one published May 12, 2026.
  • Reconstruct or upgrade a park or amenity (i.e. playground, outdoor athletic field) 401202707CS
    Priority 06 among this board's continued support requests to this agency · Fiscal year 2027 · Location the board gave: RAINEY PARK, Long Island City, NY, USA

    Department of Parks and Recreation

    Rainey Park: Renovations Including Repaving, Fencing, Benches,for Community Use upgrades are needed to complete project

    Answers published for this request

    1. Published May 12, 2026 The agency has stated that they will try to accommodate this request with existing resources. OMB supports this.
    2. Published June 30, 2026 The agency has stated that they will try to accommodate this request with existing resources. OMB supports this. This answer reads the same as the one published May 12, 2026.
  • Improve access to a park or amenity (i.e. playground, outdoor athletic field) 401202712C
    Priority 06 among this board's capital requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Department of Parks and Recreation

    Establish Waterfront Access Along North Shore of CD 1 at Luyster Creek (19th Avenue & 37th Street) for Community Use. This is a wonderful space that would have a terrific impact on the community by providing more nature/waterfront access. With the lack of green space this will enhance waterfront access for the community. This location will bridge two local development projects and requires the city to take a deep dive into its possibilities. Many flock here to bird watch. The space requires rejuvenation. NYC DEP has a Sewer run-off at the area.

    Answers published for this request

    1. Published May 12, 2026 This request is not recommended for funding.
    2. Published June 30, 2026 This request is not recommended for funding. This answer reads the same as the one published May 12, 2026.
  • Reconstruct or upgrade a building in a park 401202713C
    Priority 07 among this board's capital requests to this agency · Fiscal year 2027 · Location the board gave: DITMARS PARK, Briarwood, NY, USA

    Department of Parks and Recreation

    Ditmars Playground: Upgrade and Repair Comfort Station (Steinway Street between Ditmars & 23rd Avenue) as these Repairs are Required and Necessary for our Community Use. The Park is old and requires updates for community safety and comfort.

    Answers published for this request

    1. Published May 12, 2026 The agency recommends funding this budget request, but at this time the availability of funds is uncertain. OMB supports the agency's position.
    2. Published June 30, 2026 The agency recommends funding this budget request, but at this time the availability of funds is uncertain. OMB supports the agency's position. This answer reads the same as the one published May 12, 2026.

Department of Transportation

11 requests Open this agency

  • Repair or provide new street lights 401202715C
    Priority 01 among this board's capital requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Department of Transportation

    The area of Hallet's Point is a developing area in our community. With the addition of the NYC Ferry access to transportation has generated immense foot traffic. At a recent town-hall community members voiced a large concern regarding visibility. Installation of lighting to improve safety and improve street usage is being requested at Main Avenue between Vernon Boulevard and 8th Street; Green Park on Main Avenue-North side of Astoria Boulevard from 8-31 to 8th Street-27th Avenue North side from 8th Street; Hallet's Point Playground; Astoria Houses.

    The board recorded support for this request from: Councilman C. Constantinides

    Answers published for this request

    1. Published May 12, 2026 OMB supports the agency's position as follows: Agency supports and can accommodate Explanation: Please submit a webform request here: https://www.nyc.gov/html/dot/html/contact/conta ct-form.shtml. The unit will inspect the area for feasible lighting additions.
    2. Published June 30, 2026 OMB supports the agency's position as follows: Agency supports and can accommodate Explanation: Please submit a webform request here: https://www.nyc.gov/html/dot/html/contact/conta ct-form.shtml. The unit will inspect the area for feasible lighting additions. This answer reads the same as the one published May 12, 2026.
  • Provide new bike lanes 401202719E
    Priority 01 among this board's expense requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Department of Transportation

    Secured Bicycle racks at all subway stations in CD1Q boundaries for safe storage and bike parking at all schools in the boundaries also. Bicycle use is growing each year and secure parking is requires for these bicycles during the work and school days. Additionally week end use for these sites is beneficial to residents.

    Answers published for this request

    1. Published May 12, 2026 OMB supports the agency's position as follows: Agency supports and can accommodate Explanation: NYC DOT Prepares for Citywide Launch of Secure Bike Parking at 500 Locations https://www.nyc.gov/html/dot/html/pr2025/prepare-citywide-launch-secure-bike-parking.shtml
    2. Published June 30, 2026 OMB supports the agency's position as follows: Agency supports and can accommodate Explanation: NYC DOT Prepares for Citywide Launch of Secure Bike Parking at 500 Locations https://www.nyc.gov/html/dot/html/pr2025/prepare-citywide-launch-secure-bike-parking.shtml This answer reads the same as the one published May 12, 2026.
  • Reconstruct streets 401202716C
    Priority 02 among this board's capital requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Department of Transportation

    A Full Street Reconstruction of 32 Street off Ditmars Blvd. to dead end of 32 Street is required due to the innumerous years of underlying issues related to the combined sewer system below. This street has drainage issues that need to be rectified by the pitch and grade of the street. The road surface has deteriorated and requires the full attention of DOT.

    Answers published for this request

    1. Published May 12, 2026 Please contact the Borough Commissioner's office to discuss this request.
    2. Published June 30, 2026 Please contact the Borough Commissioner's office to discuss this request. This answer reads the same as the one published May 12, 2026.
  • Provide new bike lanes 401202720E
    Priority 02 among this board's expense requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Department of Transportation

    There is a lack of protected bicycle lanes traveling east to west and in the converse. Further studies by the Department of Transportation Queens Division are necessary within the boundaries of CD1Queens to provide safe street access to cyclists.

    Answers published for this request

    1. Published May 12, 2026 OMB supports the agency's position as follows: Agency supports and can accommodate Explanation: NYC DOT implemented several bike lane projects in 2025 and will continue to review Queens CD1 for additional opportunities.
    2. Published June 30, 2026 OMB supports the agency's position as follows: Agency supports and can accommodate Explanation: NYC DOT implemented several bike lane projects in 2025 and will continue to review Queens CD1 for additional opportunities. This answer reads the same as the one published May 12, 2026.
  • Improve traffic and pedestrian safety, including traffic calming 401202717C
    Priority 03 among this board's capital requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Department of Transportation

    CB1 Queens membership voted and sent a letter to NYC DOT in June of 2023. This letter to the agency described the need for daylighting at all intersections and the benefits to the community to transverse our local roadways. Bicyclists, drivers and pedestrians will benefit from the safer roadways by this implementation in CD1Q.

    Answers published for this request

    1. Published May 12, 2026 OMB supports the agency's position as follows: Agency does not support and cannot accommodate Explanation: NYC DOT published a study where universal daylighting was reviewed. See link here: https://www.nyc.gov/html/dot/downloads/pdf/daylighting-and-street-safety.pdf
    2. Published June 30, 2026 OMB supports the agency's position as follows: Agency does not support and cannot accommodate Explanation: NYC DOT published a study where universal daylighting was reviewed. See link here: https://www.nyc.gov/html/dot/downloads/pdf/daylighting-and-street-safety.pdf This answer reads the same as the one published May 12, 2026.
  • Conduct traffic or parking studies 401202721E
    Priority 03 among this board's expense requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Department of Transportation

    Columbus Triangle is where a tremendous amount of traffic merge. The vehicles and trucks traversing the GCP and JFK Bridge use this area to meet other options such as the BQE. Local residents are at a loss. The amount of time it takes to transverse this area is overwhelming to the residents of this community as well as to those passing through. We require a comprehensive study that will rectify the traffic flow and reduce the time of transportation.

    Answers published for this request

    1. Published May 12, 2026 Please contact the Borough Commissioner's office to discuss this request.
    2. Published June 30, 2026 Please contact the Borough Commissioner's office to discuss this request. This answer reads the same as the one published May 12, 2026.
  • Other capital budget request for DOT 401202718C
    Priority 04 among this board's capital requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Department of Transportation

    Improved street & sidewalk lighting is needed surrounding Astoria Houses for residents traversing NYC street. The existing lighting is not sufficient for our community safety.

    Answers published for this request

    1. Published May 12, 2026 OMB supports the agency's position as follows: Agency supports and can accommodate Explanation: Please submit street lighting requests to the webform here: https://www.nyc.gov/html/dot/html/contact/conta ct-form.shtml. The unit will inspect the location and determine what is feasible.
    2. Published June 30, 2026 OMB supports the agency's position as follows: Agency supports and can accommodate Explanation: Please submit street lighting requests to the webform here: https://www.nyc.gov/html/dot/html/contact/conta ct-form.shtml. The unit will inspect the location and determine what is feasible. This answer reads the same as the one published May 12, 2026.
  • Other expense budget request for DOT 401202722E
    Priority 04 among this board's expense requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Department of Transportation

    Department of Transportation - 401202018E - Increase manpower for Street Repair. The quality of the roads surface is paramount for resident and visitors alike. Potholes, sink holes and hummocks are conditions that must be addressed in a swift manor. Additional manpower is necessary due to the size of our district and the heavy use of its roads.

    Answers published for this request

    1. Published May 12, 2026 OMB supports the agency's position as follows: Agency supports but cannot accommodate Explanation: DOT will continue to provide service with existing personnel but supports request.
    2. Published June 30, 2026 OMB supports the agency's position as follows: Agency supports but cannot accommodate Explanation: DOT will continue to provide service with existing personnel but supports request. This answer reads the same as the one published May 12, 2026.
  • Improve traffic and pedestrian safety, including traffic calming 401202719C
    Priority 05 among this board's capital requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Department of Transportation

    Greatly increase the number of loading zones in commercial corridors with in CD1Q. Areas such as upper Steinway Street see immense double parking for commercial vehicles. Other areas within the district see a massive uptick in home delivery such as Ditmars Blvd. With apartments above the businesses these deliveries are a real impact. In adding commercial corridor loading zones it will reduce double parking allowing the passage of bicycles, cars, motorcycles and other trucks in a more efficient way lowering volume traffic delays. Additionally this change will provide safe roadways.

    Answers published for this request

    1. Published May 12, 2026 OMB supports the agency's position as follows: Agency supports and can accommodate Explanation: DOT has installed over 500 new loading zones that address public feedback on where they commonly see double parking and blocked bike and bus lanes due to vehicle loading and unloading. In 2023, NYC DOT launched a new web platform where New Yorkers can report problem areas. Double-parking and blocked bike and bus lanes create safety hazards and contribute to traffic congestion. These efforts complement other recent and ongoing NYC DOT initiatives to reduce the negative impacts of truck deliveries and make deliveries safer and smoother for everyone. More info available here: https://www.nyc.gov/html/dot/html/pr2024/nyc-d ot-loading-zones.shtml
    2. Published June 30, 2026 OMB supports the agency's position as follows: Agency supports and can accommodate Explanation: DOT has installed over 500 new loading zones that address public feedback on where they commonly see double parking and blocked bike and bus lanes due to vehicle loading and unloading. In 2023, NYC DOT launched a new web platform where New Yorkers can report problem areas. Double-parking and blocked bike and bus lanes create safety hazards and contribute to traffic congestion. These efforts complement other recent and ongoing NYC DOT initiatives to reduce the negative impacts of truck deliveries and make deliveries safer and smoother for everyone. More info available here: https://www.nyc.gov/html/dot/html/pr2024/nyc-d ot-loading-zones.shtml This answer reads the same as the one published May 12, 2026.
  • Add street signage or wayfinding elements 401202723E
    Priority 05 among this board's expense requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Department of Transportation

    Replace all sun faded signs on Astoria Boulevard (north & south) from 81 Street to31 Street and beyond. Street location cannot be identified because signs are so light in color from the year of mounting.

    Answers published for this request

    1. Published May 12, 2026 OMB supports the agency's position as follows: Agency supports and can accommodate Explanation: Please log this request in the webform here: https://www.nyc.gov/html/dot/html/contact/contact-form.shtml and contact the Borough Office to discuss.
    2. Published June 30, 2026 OMB supports the agency's position as follows: Agency supports and can accommodate Explanation: Please log this request in the webform here: https://www.nyc.gov/html/dot/html/contact/contact-form.shtml and contact the Borough Office to discuss. This answer reads the same as the one published May 12, 2026.
  • Improve traffic and pedestrian safety, including traffic calming 401202720C
    Priority 06 among this board's capital requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Department of Transportation

    Steinway Street is the longest outdoor Shopping Center in the country. The blocks are disproportionally longer than city blocks. Steinway Street requires streetscape improvements. With these improvements, it will enhance connectivity to the local merchants. These improvements will also provide safe passage through out the business district for shoppers. Streetscape improvements should include concrete curb extensions Steinway St, Newtown Rd &30 Ave at mid block signals and corners. A build out of green spaces is also required to create a healthier environment locations are Municipal Parking Lot #2 and Steinway Landmark Clock. This has been started and a portion completed. The project must be fully completed.

    Answers published for this request

    1. Published May 12, 2026 OMB supports the agency's position as follows: Agency supports and can accommodate Explanation: NYC has invested $12 million through the Strategy for Equity and Economic Development (SEED) Fund for public realm and streetscape improvements along Steinway Street in Astoria, Queens. https://www.nyc.gov/site/planning/about/press-releases/pr-20231122.page
    2. Published June 30, 2026 OMB supports the agency's position as follows: Agency supports and can accommodate Explanation: NYC has invested $12 million through the Strategy for Equity and Economic Development (SEED) Fund for public realm and streetscape improvements along Steinway Street in Astoria, Queens. https://www.nyc.gov/site/planning/about/press-releases/pr-20231122.page This answer reads the same as the one published May 12, 2026.

Department of Education

10 requests Open this agency

  • Other capital budget request for DOE 401202701CS
    Priority 01 among this board's continued support requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Department of Education

    DOE - Implement the Childrens Seat Belts Safety School Bus Ride Requirement

    Answers published for this request

    1. Published May 12, 2026 This item is not eligible for capital funding.
    2. Published June 30, 2026 This item is not eligible for capital funding. This answer reads the same as the one published May 12, 2026.
  • Other capital budget request for DOE 401202703C
    Priority 01 among this board's capital requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Department of Education

    STEM (Science, Technology, Engineering & Math) Programs and platforms including but not limited to Microsoft Suite, Adobe, Google, and other platforms and programs should be taught for internships and work/employment. Students are entering the workforce inadequately prepared in the knowledge of basic word processing, design or internet skills which are crucial to entering and succeeding in the workforce today. Each and every school with in the boundaries Elementary, Middle and High School throughout the district should be able to provide training to our children for the life skills necessary to achieve.

    Answers published for this request

    1. Published May 12, 2026 OMB supports the agency's position as follows: Agency does not support and cannot accommodate Explanation: NOT A CAPITAL BBUDGET REQUEST. PLEASE CONTACT DOE.
    2. Published June 30, 2026 OMB supports the agency's position as follows: Agency does not support and cannot accommodate Explanation: NOT A CAPITAL BBUDGET REQUEST. PLEASE CONTACT DOE. This answer reads the same as the one published May 12, 2026.
  • Other expense budget request for DOE 401202708E
    Priority 01 among this board's expense requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Department of Education

    Due to the product availability, we require middle school and high school education surrounding drugs and the awareness of the dangers of use, vaping and Tabacco including cigarettes. This training should include Narcan. Parents should also have access to training for their knowledge. CD1Q schools should all have this programing.

    Answers published for this request

    1. Published May 12, 2026 Please contact the Agency directly and promptly for more information (917-455-0513)
    2. Published June 30, 2026 Please contact the Agency directly and promptly for more information (917-455-0513) This answer reads the same as the one published May 12, 2026.
  • Provide a new or expand an existing elementary school 401202711CS
    Priority 01 among this board's continued support requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Department of Education

    Our Community Requires One Unified Building for the Gifted and Talented Program. The Existing Model does not Work. The School is Housed 15 Minutes Travel Apart. It Causes a Burden to Children Faculty and Parents on a Multi Faceted level. Leaving Children to Feel Like a Visitor in their Own School. We Request one Unified Building to House this Program. With the number of Children in SD 30 this is a Reasonable Request.

    Answers published for this request

    1. Published May 12, 2026 OMB supports the agency's position as follows: Agency does not support and cannot accommodate Explanation: CONTACT DOE.
    2. Published June 30, 2026 OMB supports the agency's position as follows: Agency does not support and cannot accommodate Explanation: CONTACT DOE. This answer reads the same as the one published May 12, 2026.
  • Renovate other site component 401202729C
    Priority 01 among this board's capital requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Department of Education

    Renovation for the auditoriums of IS 141 and IS 126 are necessary. IS 126 is located at 31-51 21 Street, Astoria, NY 11106. IS 141 is located at 37-11 21 Avenue, Astoria, NY 11105. These two intermediate schools require auditorium renovations as the areas are antiquated and the students require a modernization for educational benefit. Both facilities are in urgent need of renovation to be utilized to their full potential for the students curriculum.

    Answers published for this request

    1. Published May 12, 2026 OMB supports the agency's position as follows: Agency supports but cannot accommodate Explanation: RESO A AUDITORIUM IN SCOPE.
    2. Published June 30, 2026 OMB supports the agency's position as follows: Agency supports but cannot accommodate Explanation: RESO A AUDITORIUM IN SCOPE. This answer reads the same as the one published May 12, 2026.
  • Provide, expand, or enhance funding for Child Care and Head Start programs 401202709E
    Priority 02 among this board's expense requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Department of Education

    Expand Day Care Programs to assist working families and enhance the education of all children to provide them with better life opportunities. Education has been proven to provide well rounded individuals. Children learn how to interact with others and reach their full potential as individuals. In addition according to some studies, children enrolled in these type of programs are more behaved and have higher IQ scores upon enrolling kindergarten than their peers without a formal education.

    Answers published for this request

    1. Published May 12, 2026 Please contact the Agency directly and promptly for more information (917-455-0513)
    2. Published June 30, 2026 Please contact the Agency directly and promptly for more information (917-455-0513) This answer reads the same as the one published May 12, 2026.
  • Provide a new or expand an existing middle/intermediate school 401202730C
    Priority 02 among this board's capital requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Department of Education

    In the vicinity of Astoria Boulevard and 27 Avenue area there has been growth. With that growth our middle schools have become over crowded. In order to meet the educational needs of the community we require the development of middle school(s) with in this section of CD1Q. The building of middle school(s) will provide the seats for the children post development in our community reducing the overcrowding in the Hallett's area fulfilling our obligation to our youths education.

    Answers published for this request

    1. Published May 12, 2026 OMB supports the agency's position as follows: Agency supports but cannot accommodate Explanation: The agency does not/cannot give priority to funding this request.
    2. Published June 30, 2026 OMB supports the agency's position as follows: Agency supports but cannot accommodate Explanation: The agency does not/cannot give priority to funding this request. This answer reads the same as the one published May 12, 2026.
  • Assign more teaching staff 401202710E
    Priority 03 among this board's expense requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Department of Education

    Funding for additional School Librarians in each of the schools in CD1Q is required. Trained School Librarians are needed to enrich English Language Arts/ELA lessons, help student conduct research for their school papers and projects and promote literacy through curated programs. Lirarians are critical for accessing information, promoting information, and digital literacy. They help to build strong communitiesand build skills.

    Answers published for this request

    1. Published May 12, 2026 Please contact the Agency directly and promptly for more information (917-455-0513)
    2. Published June 30, 2026 Please contact the Agency directly and promptly for more information (917-455-0513) This answer reads the same as the one published May 12, 2026.
  • Provide more funds for teaching resources such as classroom material 401202711E
    Priority 04 among this board's expense requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Department of Education

    Providing funding for CD1Q schools for dance, music and theater programs. Arts and culture are essential to well-rounded students. Theater, dance and music create communication and collaboration improving emotional growth and build self confidence in students. This is a lifelong benefit of arts study.

    Answers published for this request

    1. Published May 12, 2026 Please contact the Agency directly and promptly for more information (917-455-0513)
    2. Published June 30, 2026 Please contact the Agency directly and promptly for more information (917-455-0513) This answer reads the same as the one published May 12, 2026.
  • Assign more teaching staff 401202712E
    Priority 05 among this board's expense requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Department of Education

    In CD1, Q we require additional STEM (Science, Technology, Engineering and Math)/ Computer Lab teachers. Trained teachers in STEM/Computer Lab are required to teach computer platforms and applications to students in CD1Q to expand their knowledge and potential. These educators are needed in all/each schools in the district. These teachers will provide opportunity to the future generation and expand their growth in the field.

    Answers published for this request

    1. Published May 12, 2026 Please contact the Agency directly and promptly for more information (917-455-0513)
    2. Published June 30, 2026 Please contact the Agency directly and promptly for more information (917-455-0513) This answer reads the same as the one published May 12, 2026.

Fire Department

6 requests Open this agency

  • Provide new facilities such as a firehouse or EMS station 401202722C
    Priority 01 among this board's capital requests to this agency · Fiscal year 2027 · Location the board gave: 37-20 29 STREET, Long Island City, NY, USA

    Fire Department

    We Request to re-open Firehouse 261, Ladder 116 at 29th Street between 37th & 38th Avenues due to the immense building in our district. With the Influx of Thousands of Residents, Students and Visitors development occurs., We Require the Firehouse to be Reopened for Community Safety. In this Area We have 47 Hotels and Quite a Few Large Developments in Progress. The Current Local Residents Safety Must be Addressed as Well as the People on Roosevelt Island. Our district provides FDNY services to Roosevelt Island due to the only land mass connection.

    Answers published for this request

    1. Published May 12, 2026 OMB supports the agency's position as follows: Agency supports but cannot accommodate Explanation: FDNY is supportive of this request in concept, however the priority remains the maintenance/upkeep of existing facilities. FDNY assesses operational needs on a regular basis and will accommodate needs as best able within existing budget
    2. Published June 30, 2026 OMB supports the agency's position as follows: Agency supports but cannot accommodate Explanation: FDNY is supportive of this request in concept, however the priority remains the maintenance/upkeep of existing facilities. FDNY assesses operational needs on a regular basis and will accommodate needs as best able within existing budget This answer reads the same as the one published May 12, 2026.
  • Other expense budget request for FDNY 401202725E
    Priority 01 among this board's expense requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Fire Department

    FDNY requires a mobile emergency response unit to service the community. FDNY relies on it vehicles to service a tremendous amount of people and as the population grows the inventory has not. This will help make FDNY's job even more responsive.

    Answers published for this request

    1. Published May 12, 2026 OMB supports the agency's position as follows: Agency supports but cannot accommodate Explanation: FDNY will seek to accommodate within existing resources, although this will depend on availability of funding and overall agency prioritization. The Community Board should continue work with their relevant elected officials to allocate Council/BP capital funding at Budget
    2. Published June 30, 2026 OMB supports the agency's position as follows: Agency supports but cannot accommodate Explanation: FDNY will seek to accommodate within existing resources, although this will depend on availability of funding and overall agency prioritization. The Community Board should continue work with their relevant elected officials to allocate Council/BP capital funding at Budget This answer reads the same as the one published May 12, 2026.
  • Other expense budget request for FDNY 401202726E
    Priority 02 among this board's expense requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Fire Department

    Upgrade FDNY equipment permanent generators in each and every fire house to aid FDNY and the community in the time of an emergency. The intention is for the entire station to be provided power so it is able to be fully functioning during any emergency that might occur.

    Answers published for this request

    1. Published May 12, 2026 OMB supports the agency's position as follows: Agency supports but cannot accommodate Explanation: FDNY will seek to accommodate within existing resources, although this will depend on availability of funding and overall agency prioritization. The Community Board should continue work with their relevant elected officials to allocate Council/BP capital funding at Budget
    2. Published June 30, 2026 OMB supports the agency's position as follows: Agency supports but cannot accommodate Explanation: FDNY will seek to accommodate within existing resources, although this will depend on availability of funding and overall agency prioritization. The Community Board should continue work with their relevant elected officials to allocate Council/BP capital funding at Budget This answer reads the same as the one published May 12, 2026.
  • Other expense budget request for FDNY 401202727E
    Priority 03 among this board's expense requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Fire Department

    FDNY can get a specialized fire extinguisher specifically for Lithium- Ion batteries. Many current foam-based extinguishers are insignificant to douse lithium-Ion fires. These are needed in every fire house in CD1Q

    Answers published for this request

    1. Published May 12, 2026 OMB supports the agency's position as follows: Agency supports and can accommodate Explanation: FDNY has an existing budget to outfit fire houses with needed equipment.
    2. Published June 30, 2026 OMB supports the agency's position as follows: Agency supports and can accommodate Explanation: FDNY has an existing budget to outfit fire houses with needed equipment. This answer reads the same as the one published May 12, 2026.
  • Other expense budget request for FDNY 401202728E
    Priority 04 among this board's expense requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Fire Department

    FDNY requires certain equipment to do their tasks. The FDNY will require the 9 inch Dwalt battery-operated concrete saw DCS690x2 this kit includes charger and two 20x60 flex volts 9amp battery. FDNY kit replaces the 9amp batteries with two 20 volts/60 volts max lithium ion 12 amp batteries for more running time. Each fire house in CD1Q should receive this /these kits.

    Answers published for this request

    1. Published May 12, 2026 OMB supports the agency's position as follows: Agency supports and can accommodate Explanation: FDNY has an existing budget to outfit fire houses with needed equipment.
    2. Published June 30, 2026 OMB supports the agency's position as follows: Agency supports and can accommodate Explanation: FDNY has an existing budget to outfit fire houses with needed equipment. This answer reads the same as the one published May 12, 2026.
  • Other expense budget request for FDNY 401202729E
    Priority 05 among this board's expense requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Fire Department

    The MERV (Major Emergency Response Vehicle) is used to triage and treat patients in a controlled, closed environment.

    Answers published for this request

    1. Published May 12, 2026 OMB supports the agency's position as follows: Agency supports but cannot accommodate Explanation: FDNY will seek to accommodate within existing resources, although this will depend on avaialbility of funding and overall agency prioritization. The Community Board should work with their relevant elected officials to allocate Council/BP capital funding at Budget
    2. Published June 30, 2026 OMB supports the agency's position as follows: Agency supports but cannot accommodate Explanation: FDNY will seek to accommodate within existing resources, although this will depend on avaialbility of funding and overall agency prioritization. The Community Board should work with their relevant elected officials to allocate Council/BP capital funding at Budget This answer reads the same as the one published May 12, 2026.

Police Department

6 requests Open this agency

Show these 6 requests
  • Renovate or upgrade existing precinct houses 401202728C
    Priority 01 among this board's capital requests to this agency · Fiscal year 2027 · Location the board gave: 43-16 ASTORIA BOULEVARD, Astoria, NY, USA

    Police Department

    Due to multiple issues with the old structure our officers require a larger, cleaner/healthier & efficient space to work in. In past years, our officers have had numerous floods in their locker rooms from sewage backup during rain. The building was scaffold for approximately 5 years due to deterioration. Our current structure is too small for the number of officers our district requires. The 5x5 rooms must be share with multiple users. The building itself is out dated and it would cost more to update versus a reconstruction. With the massive increase in residents and expansion in night life our district requires more manpower. There is no space in the building as it exists to accommodate additional staff we need. When this structure is built parking needs to be considered in the plan.

    Answers published for this request

    1. Published May 12, 2026 Due to fiscal constraints, the availability of funds is uncertain.
    2. Published June 30, 2026 Due to fiscal constraints, the availability of funds is uncertain. This answer reads the same as the one published May 12, 2026.
  • Hire additional uniformed officers 401202730E
    Priority 01 among this board's expense requests to this agency · Fiscal year 2027 · Location the board gave: 114 PRECINCT, Astoria, NY, USA

    Police Department

    Increase uniformed personnel for 114 Precinct. As Our district grows due to the recent construction uptick, we require more officers to meet the demand of calls/incidents to serve our residents and visitors keeping our neighborhoods safe. Our dining and nightlife has grown by three fold. We are also a transportation hub which has visitors passing through our boundaries increasing the population served. Therefore, additional officers are needed to service the public.

    Answers published for this request

    1. Published May 12, 2026 The agency has stated that they will try to accommodate this request with existing resources. OMB supports this.
    2. Published June 30, 2026 The agency has stated that they will try to accommodate this request with existing resources. OMB supports this. This answer reads the same as the one published May 12, 2026.
  • Hire additional uniformed officers 401202731E
    Priority 02 among this board's expense requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Police Department

    Increase Funds for Evening Inspectors in Collaboration with NYC Agencies and NYPD for MARCHES. Our District has an Extremely Large Number of Establishments that at times Violate Rules and Regulations. There has been serious injuries and fatalities due to bad actors. Impact has been felt in the quality of life in CD1Q. Enforcement MARCHES will be proactive not reactive. By having more manpower site can be monitored and addressed faster making the community safer. Corrections in negative actions will be expedited by the services provided.

    Answers published for this request

    1. Published May 12, 2026 The agency will try to accommodate this issue within existing resources. OMB supports the agency's position.
    2. Published June 30, 2026 The agency will try to accommodate this issue within existing resources. OMB supports the agency's position. This answer reads the same as the one published May 12, 2026.
  • Other NYPD staff resources requests 401202732E
    Priority 03 among this board's expense requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Police Department

    Cure Violence, De-Escalation, Conflict Resolution, Team Building, Training/Programming for the 114th Police Precinct NYPD 34-16 Astoria Boulevard South, Astoria, NY11103

    Answers published for this request

    1. Published May 12, 2026 OMB supports the agency's position as follows: Agency supports but cannot accommodate Explanation: Approval of this request depends on sufficient Federal/State funds.
    2. Published June 30, 2026 OMB supports the agency's position as follows: Agency supports but cannot accommodate Explanation: Approval of this request depends on sufficient Federal/State funds. This answer reads the same as the one published May 12, 2026.
  • Other NYPD staff resources requests 401202733E
    Priority 04 among this board's expense requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Police Department

    Fast readers for traffic violations are requested for NYPD. These readers electronically provide expedited information to the officers. Traffic officers are currently equipped with "Fast" license plate readers that immediately scan a plate, pullup prior tickets, and print out a ticket automatically. Many standard officers have to manually fill the ticket out, which slows down enforcement. This tool is beneficial to processing violations for every officer.

    Answers published for this request

    1. Published May 12, 2026 OMB supports the agency's position as follows: The agency does not understand the request as written and requires more clarification. Explanation: This request requires further study.
    2. Published June 30, 2026 OMB supports the agency's position as follows: The agency does not understand the request as written and requires more clarification. Explanation: This request requires further study. This answer reads the same as the one published May 12, 2026.
  • Hire additional crossing guards 401202734E
    Priority 05 among this board's expense requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Police Department

    As our district grows, we require additional school crossing guards to assure the safe passage of children to and from school. We need to supply the schools in our district (SD30) with the adequate number of crossing guards to protect our children from harm at each school. The hire of qualified individuals is necessary and an uptick in personnel must be achieved. Stronger advertising and outreach must be done to entice applicants.

    Answers published for this request

    1. Published May 12, 2026 The agency will try to accommodate this issue within existing resources. OMB supports the agency's position.
    2. Published June 30, 2026 The agency will try to accommodate this issue within existing resources. OMB supports the agency's position. This answer reads the same as the one published May 12, 2026.
Show fewer agencies

Department for the Aging

5 requests Open this agency

Show these 5 requests
  • Renovate or upgrade a senior center 401202702C
    Priority 01 among this board's capital requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Department for the Aging

    Throughout CD1, Queens the senior centers are older and require modernization post Covid 19. These facilities provide essential services to our older population. Kitchens in centers are antiquated. Floors in the centers require replacement and /or upgrading, Structures require maintenance and reimagining for multi-use. High speed technology installation and other items have been noted for during renovations throughout the districts centers. Our elder population relies on the services and as our senior population expands (post baby-boomer) these facilities are highly utilized in our district, As gen X and millennials grow older preparations need to be made for the extremely high rate of older New Yorkers to follow.

    Answers published for this request

    1. Published May 12, 2026 Further study by the agency of this request is needed.
    2. Published June 30, 2026 Further study by the agency of this request is needed. This answer reads the same as the one published May 12, 2026.
  • Increase transportation services capacity 401202702E
    Priority 01 among this board's expense requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Department for the Aging

    My Ride Program (Taxi Smart Card Pilot) Program expanded to for CD 1. We have requested for the opportunity for our residents to have the pilot in our district since the sunset of the Taxi Smart Card program with similar features. The program had no funding for advertising. It failed because of lack of use. Advertising is necessary for new programs to jump-start. We now have social media. This program allowed the elderly and disabled to have access to transportation in a real-world way. Individuals were able to access things such as doctor's appointments. Due to the limitations of other services this program was a quality-of-life asset. This program requires funding and expansion.

    Answers published for this request

    1. Published May 12, 2026 Further study by the agency of this request is needed.
    2. Published June 30, 2026 Further study by the agency of this request is needed. This answer reads the same as the one published May 12, 2026.
  • Provide additional senior center staffing 401202703E
    Priority 02 among this board's expense requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Department for the Aging

    As the Baby Boomer (61 million) generation matures and the Millennials (1.5 billion) are aging the adult population is magnifying. Funding for additional personnel in Senior Centers has become evident. The Boomers noted at one time to be the "largest" generation are now in need of elder services. Additional personnel in CD1Q to service this growing demographic is sorely needed to keep up with service provision. Preparation for the aging Millennials needs to be made approximately (44%) in population in a nyc.gov report for Astoria., Queens. We require senior centers for the vital services they provide.

    Answers published for this request

    1. Published May 12, 2026 Further study by the agency of this request is needed.
    2. Published June 30, 2026 Further study by the agency of this request is needed. This answer reads the same as the one published May 12, 2026.
  • Other expense budget request for DFTA 401202704E
    Priority 03 among this board's expense requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Department for the Aging

    Funding for Training programs in technology for the senior population in CD1 for health, mental and social needs of the elder population. Having the ability to reach a doctor when needed with out the additional risk of any contamination is priceless. Providing the tools to use technology will enhance the mental and social needs of a generation that can become isolated during social and natural events.

    Answers published for this request

    1. Published May 12, 2026 Further study by the agency of this request is needed.
    2. Published June 30, 2026 Further study by the agency of this request is needed. This answer reads the same as the one published May 12, 2026.
  • Funding for a new senior center program 401202705E
    Priority 04 among this board's expense requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Department for the Aging

    Our Senior Community is in dire need of space to gather. Senior centers provide services to our community that are needed and necessary. The Astoria Heights section of our District is in need of a designated Senior Center. Area-20 Ave. to Ditmars Blvd. from Steinway St. to 81 Street there is not enough services in this section of CD1Q.

    Answers published for this request

    1. Published May 12, 2026 Further study by the agency of this request is needed.
    2. Published June 30, 2026 Further study by the agency of this request is needed. This answer reads the same as the one published May 12, 2026.
Show fewer agencies

Economic Development Corporation

4 requests Open this agency

Show these 4 requests
  • Invest in infrastructure that will support growth in commercial business districts 401202708CS
    Priority 01 among this board's continued support requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Economic Development Corporation

    Improve the Speed, Cost and Availability of Broadband access to Local Businesses & Residents in CD1.

    Answers published for this request

    1. Published May 12, 2026 OMB supports the agency's position as follows: Agency does not support and cannot accommodate Explanation: Internet connectivity and Wi-Fi infrastructure falls under the purview of NYC OTI. We encourage CB1 to reach out to the relevant agency for this request.
    2. Published June 30, 2026 OMB supports the agency’s position. This answer reads differently from the one published May 12, 2026.
  • Invest in capital projects to improve access to waterfront 401202721C
    Priority 01 among this board's capital requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Economic Development Corporation

    Hallets Cove Piers: Reconstruct for Waterfront Recreational Use at 31 Avenue and Vernon Boulevard for Community Recreation. This is a vital area to the community which is growing. This reconstruction could provide access that is desperately needed. With a lack of green space upgrades for community use are always sought out and welcomed. Lively waterfronts attract visitors, and economic growth can follow providing local employment.

    Answers published for this request

    1. Published May 12, 2026 OMB supports the agency's position as follows: Agency supports but cannot accommodate Explanation: Hallets Cove's reconstruction was completed in 2021. The Department of Parks oversees recreational uses at Hallets Cove and currently offers kayaking/canoeing in partnership with the LIC Boathouse.
    2. Published June 30, 2026 OMB supports the agency’s position. This answer reads differently from the one published May 12, 2026.
  • Other capital budget request for EDC 401202709CS
    Priority 02 among this board's continued support requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Economic Development Corporation

    EDC - Waterfront area is deteriorated and cleanup of the area is necessary.

    Answers published for this request

    1. Published May 12, 2026 The agency requires additional information from the community board regarding this request
    2. Published June 30, 2026 OMB supports the agency’s position. This answer reads differently from the one published May 12, 2026.
  • Other capital budget request for EDC 401202710CS
    Priority 03 among this board's continued support requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Economic Development Corporation

    401202040C EDC - Tax incentive initiatives should be implemented and offered to all businesses in CD1. (item-4)

    Answers published for this request

    1. Published May 12, 2026 OMB supports the agency's position as follows: Agency supports and can accommodate Explanation: NYCEDC offers various tax incentives via its NYCIDA and BuildNYC programs. If any business in CB1 is interested in applying to tax incentives through these programs, please visit https://edc.nyc/nycida
    2. Published June 30, 2026 OMB supports the agency’s position. This answer reads differently from the one published May 12, 2026.
Show fewer agencies

Department of Environmental Protection

3 requests Open this agency

Show these 3 requests
  • Other capital budget request for DEP 401202704C
    Priority 01 among this board's capital requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Department of Environmental Protection

    On 32 Street off Ditmars Blvd. to Dead End of 32 St. there exists a combined sewer that has been failing for in-numerous years, some complaints go back 45 to 50 years. With the influx of new residents and the historic failing system the combined sewer cannot handle the wastewater and run-off. The residents are suffering with perpetual flooding of wastewater in their homes. This unsanitary condition need be repaired immediately. After consultation with DEP this reconstruction has been the prescribed remedy. We are seeking an expedited repair on 32 Street due to the detrimental conditions our residents face.

    The board recorded support for this request from: Councilman C. Constantinides

    Answers published for this request

    1. Published May 12, 2026 OMB supports the agency's position as follows: Agency does not support and cannot accommodate Explanation: PLEASE CONTACT THE AGENCY DIRECTLY AND PROMPTLY FOR MORE INFORMATION.
    2. Published June 30, 2026 OMB supports the agency's position as follows: Agency does not support and cannot accommodate Explanation: PLEASE CONTACT THE AGENCY DIRECTLY AND PROMPTLY FOR MORE INFORMATION. This answer reads the same as the one published May 12, 2026.
  • Inspect sanitary sewer on specific street segment and repair or replace as needed 401202705C
    Priority 02 among this board's capital requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Department of Environmental Protection

    20th Road, 21st Street to 32nd Street Sewer Main Replacement. Neighbors have decades of issues and are seeking a sewer main replacement due to the conditions/hardships the community is enduring. The community has developed and with growth the issues have increased.

    Answers published for this request

    1. Published May 12, 2026 OMB supports the agency's position as follows: Agency does not support and cannot accommodate Explanation: PLEASE CONTACT THE AGENCY DIRECTLY AND PROMPTLY FOR MORE INFORMATION.
    2. Published June 30, 2026 OMB supports the agency's position as follows: Agency does not support and cannot accommodate Explanation: PLEASE CONTACT THE AGENCY DIRECTLY AND PROMPTLY FOR MORE INFORMATION. This answer reads the same as the one published May 12, 2026.
  • Inspect sanitary sewer on specific street segment and repair or replace as needed 401202706C
    Priority 03 among this board's capital requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Department of Environmental Protection

    21 Road and 21st Street to 32 Street Sewer main replacement is required. The Neighbors have decades of issues and are seeking a sewer main replacement due to the hardships and conditions the community is enduring. The community has developed and with that growth the issues have increased detrimentally.

    Answers published for this request

    1. Published May 12, 2026 OMB supports the agency's position as follows: Agency does not support and cannot accommodate Explanation: PLEASE CONTACT THE AGENCY DIRECTLY AND PROMPTLY FOR MORE INFORMATION.
    2. Published June 30, 2026 OMB supports the agency's position as follows: Agency does not support and cannot accommodate Explanation: PLEASE CONTACT THE AGENCY DIRECTLY AND PROMPTLY FOR MORE INFORMATION. This answer reads the same as the one published May 12, 2026.
Show fewer agencies

Department of Homeless Services

2 requests Open this agency

Show these 2 requests
  • Provide new homeless shelters or SROs 401202701C
    Priority 01 among this board's capital requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Department of Homeless Services

    In CD1Q we have a shelter under construction it has not yet completed the build out. We have a large number of hotels in our boundaries being utilized. Permanent shelters for housing with services is necessary to meet basic needs, provide support, reduce crime, build community and improve public health standings.

    Answers published for this request

    1. Published May 12, 2026 OMB supports the agency's position as follows: Agency supports and can accommodate Explanation: Contact the agency, Office of Intergovernmental Affairs, for further discussion.
    2. Published June 30, 2026 OMB supports the agency's position as follows: Agency supports and can accommodate Explanation: Contact the agency, Office of Intergovernmental Affairs, for further discussion. This answer reads the same as the one published May 12, 2026.
  • Improve safety at homeless shelters 401202701E
    Priority 01 among this board's expense requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Department of Homeless Services

    The addition of staffing Peace Officers for homeless and migrant centers in CD1Q is needed for the safety and security of residents in these housing developments. While our City is utilizing hotels as housing developments the security provided would be an asset to the residents and neighbors alike. Peace officers are placed to facilitate the residents and vendors as well as the community. Peace Officers in CD1Q provided by DHS are service providers to assist the residential population in a safer environment and they also reduce the strain on other agencies. Funding for Peace officers is a necessity in each site in CD1Q.

    Answers published for this request

    1. Published May 12, 2026 Funding and/or headcount was recently added. OMB supports the agency's position as follows:
    2. Published June 30, 2026 Funding and/or headcount was recently added. OMB supports the agency's position as follows: This answer reads the same as the one published May 12, 2026.
Show fewer agencies

Department of Housing Preservation & Development

2 requests Open this agency

Show these 2 requests
  • Provide more housing for extremely low and low income households 401202725C
    Priority 01 among this board's capital requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Department of Housing Preservation & Development

    CB1, Queens acknowledges the intense need for extremely low cost housing for low-income individuals and families. The rate of housing increases has priced individuals out of homes and the need to provide shelter for neighbors is a dire need. Permanently extremely low cost housing must be provided to assist our neighbors.

    Answers published for this request

    1. Published May 12, 2026 OMB supports the agency's position as follows: Agency supports and can accommodate Explanation: HPD finances and supports different types of projects. Many projects are 100% affordable, and a portion of those units are ELI/VLI. Some projects contain a majority of ELI/VLI units. While HPD is breaking affordable housing production records, there is more work to be done. HPD will continue to maximize the use of subsidy and Low Income Housing Tax Credits (LIHTC) to projects in our development pipeline throughout the Five Boroughs, including those serving Very Low Income (VLI) and Extremely Low Income (ELI) populations.
    2. Published June 30, 2026 The Executive Budget includes a city-wide allocation for this work. Specific locations are determined by the Agency. This answer reads differently from the one published May 12, 2026.
  • Other capital budget request for HPD 401202726C
    Priority 02 among this board's capital requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Department of Housing Preservation & Development

    In our District we require the provision of supportive adaptive housing for seniors, domestic violence, and neurodiverse individuals. Services are lacking citywide and having district centric housing within CD1Q is absolutely needed. Our community has seen an uptick in new New Yorkers, migration and homeless population some of which require these sensitive services.

    Answers published for this request

    1. Published May 12, 2026 OMB supports the agency's position as follows: Agency supports and can accommodate Explanation: HPD will continue to fund the construction of supportive housing from the development pipeline to maximize available resources.
    2. Published June 30, 2026 The Executive Budget includes a city-wide allocation for this work. Specific locations are determined by the Agency. This answer reads differently from the one published May 12, 2026.
Show fewer agencies

Health and Hospitals Corporation

2 requests Open this agency

Show these 2 requests
  • Provide a new or expanded health care facility 401202723C
    Priority 01 among this board's capital requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Health and Hospitals Corporation

    Provide a new or expanded health care facility. Our district is in dire need of attention to a trauma center with in our boundaries as there is no access to the necessary services provided by a trauma center locally. Health services are limited and implementing a new healthcare facility would facilitate human services as we saw the impact during the Pandemic (Covid 19, 2019) where our area was part of the epicenter and our only in district hospital was impacted dramatically. With the vertical growth and future population this is essential to the well-being of our district.

    Answers published for this request

    1. Published May 12, 2026 OMB supports the agency's position as follows: Agency supports but cannot accommodate Explanation: NYC Health + Hospitals/Elmhurst has developed a master plan for the existing campus that will accommodate all current and future needs. Currently, we are in the process of renovating many services and modernizing infrastructure. Any Annex in an area outside of the current campus would require further study."
    2. Published June 30, 2026 OMB supports the agency's position as follows: Agency supports but cannot accommodate Explanation: NYC Health + Hospitals/Elmhurst has developed a master plan for the existing campus that will accommodate all current and future needs. Currently, we are in the process of renovating many services and modernizing infrastructure. Any Annex in an area outside of the current campus would require further study." This answer reads the same as the one published May 12, 2026.
  • Renovate or upgrade an existing health care facility 401202724C
    Priority 02 among this board's capital requests to this agency · Fiscal year 2027 · Location the board gave: 25-10 30 AVENUE, Astoria, NY, USA

    Health and Hospitals Corporation

    Our district requires funding for the sixth floor of Mt. Sinai Queens Hospital to be used for ICU for our district's health and safety. During the Covid-19 Pandemic our hospitals were inundated with critical care patients requiring the hospital to convert areas into ICUs to accommodate the surge of critically ill patients. The growth of our community demands this service be in place for the well-being of patients.

    Answers published for this request

    1. Published May 12, 2026 The request does not seem to be applicable to the Responsible Agency. OMB cannot make a determination at this time.
    2. Published June 30, 2026 The request does not seem to be applicable to the Responsible Agency. OMB cannot make a determination at this time. This answer reads the same as the one published May 12, 2026.
Show fewer agencies

Department of Buildings

1 request Open this agency

Show this request
  • Assign additional building inspectors (including expanding training programs) 401202706E
    Priority 01 among this board's expense requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Department of Buildings

    CD1 is in extreme need for building inspectors. The hire of additional building inspectors will facilitate and address the multitude of complaints reported to the 311 system. Building Inspectors are a vital tool to ensure the safety of existing and new structures. As our district grows we have a multitude of complaints and require a sufficient amount of inspectors to respond in a timely fashion.

    Answers published for this request

    1. Published May 12, 2026 The agency will try to accommodate this issue within existing resources.
    2. Published June 30, 2026 The agency will try to accommodate this issue within existing resources. This answer reads the same as the one published May 12, 2026.
Show fewer agencies

Department of City Planning

1 request Open this agency

Show this request
  • Other expense request for DCP 401202707E
    Priority 01 among this board's expense requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Department of City Planning

    A comprehensive study of Northern Boulevard for the length of Northern Boulevard within the CD1 Boundaries.... DCP planning can provide a snapshot of what the area could look like in the future Land Use & Zoning changes have a tremendous impact on the residents of the district.

    Answers published for this request

    1. Published May 12, 2026 The agency has stated that they will try to accommodate this request with existing resources. OMB supports this.
    2. Published June 30, 2026 The agency has stated that they will try to accommodate this request with existing resources. OMB supports this. This answer reads the same as the one published May 12, 2026.
Show fewer agencies

Department of Health and Mental Hygiene

1 request Open this agency

Show this request
  • Increase health and safety inspections, e.g. for restaurants and childcare programs 401202713E
    Priority 01 among this board's expense requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Department of Health and Mental Hygiene

    Hire Additional Health Department Inspectors for Bar, Restaurant, Nightlife, Cart and Rodent Inspection. Additional inspectors are necessary due to the number of businesses open & opening in our district. With the unprecedented growth in our community, services are at an all-time high demand. Response times for inspectors for follow up visits need to be increased. The manpower must be available to do site visits and follow -up services in our boundaries. Additionally with new development rat dens are disturbed and the impact is being felt by the community with rats transversing our streets even making dens in our tree pits. Manpower is essential for the cleanliness of our district.

    Answers published for this request

    1. Published May 12, 2026 OMB supports the agency's position as follows: This request has already been completed. Explanation: Public Health Sanitarians and Exterminators are niche public service positions that require minimum education and certifications. Challenges remain for recruitment and hiring as these civil service title requirements are governed by state laws and remains a challenge
    2. Published June 30, 2026 OMB supports the agency's position as follows: This request has already been completed. Explanation: Public Health Sanitarians and Exterminators are niche public service positions that require minimum education and certifications. Challenges remain for recruitment and hiring as these civil service title requirements are governed by state laws and remains a challenge This answer reads the same as the one published May 12, 2026.
Show fewer agencies

Department of Sanitation

1 request Open this agency

Show this request
  • Provide new or upgrade existing sanitation garages or other sanitation infrastructure 401202714C
    Priority 01 among this board's capital requests to this agency · Fiscal year 2027 · Location the board gave: 34-28 21 STREET, Long Island City, NY, USA

    Department of Sanitation

    Expand QW1 Sanitation Garage size and move from location. The Existing Structure was Built in 1937 and is Dilapidated. In Order to Provide Full Sanitation Services to our Community in an Effective Manor this Action must be taken Immediately. The Community has Grown and the Services Necessary to Keep Up with the Community cannot be Provided from the Existing Space. The Community Requires a Garage that can Provide Services now and into the Future Taking into Consideration the Changing Dynamics of Sanitation. The New Garage on the New Site must Support the Future Growth in Population Occurring Due to Development.

    Answers published for this request

    1. Published May 12, 2026 OMB supports the agency's position as follows: Agency supports and can accommodate Explanation: This project is funded and continues to move forward.
    2. Published June 30, 2026 OMB supports the agency's position as follows: Agency supports and can accommodate Explanation: This project is funded and continues to move forward. This answer reads the same as the one published May 12, 2026.
Show fewer agencies

Department of Youth & Community Development

1 request Open this agency

Show this request
  • Other expense budget request for DYCD 401202724E
    Priority 01 among this board's expense requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Department of Youth & Community Development

    Study to identify location and build new school in CD1Q. Expand After School Programs in CD 1 for the educational and emotional growth of the students. After school programs will provide the children with a safe place to embrace topics, they may not touch upon during the school day and develop a passion for learning. Also, athletic opportunities become accessible to students that are not part of the daily curriculum which enhance their health and well being. These programs reduce risky behavior and provide a safe place for children with working parents.

    Answers published for this request

    1. Published May 12, 2026 OMB supports the agency's position as follows: This request has already been completed. Explanation: Presently, there are a variety of agency-funded programs in the district for this target population, including six community centers and more than one dozen COMPASS afterschool programs.
    2. Published June 30, 2026 This request has already been completed. Explanation: Presently, there are a variety of agency-funded programs in the district for this target population, including six community centers and more than one dozen COMPASS afterschool programs. Between May 12, 2026 and this publication only the publisher's wrapper sentence changed. The answer itself reads the same.
Show fewer agencies

Housing Authority

1 request Open this agency

Show this request
  • Create more housing on NYCHA properties 401202727C
    Priority 01 among this board's capital requests to this agency · Fiscal year 2027 · The board gave no location for this request.

    Housing Authority

    Dedicated section 9 housing is essential to provide affordable housing to our community, With in our boundaries we have Astoria Houses, Ravenswood, Woodside and Queensbridge. The section 9 housing would promise homes to individuals who are struggling in this intense housing market. CD1 requires Section 9 housing dedicated to our NYCHA housing developments.

    Answers published for this request

    1. Published May 12, 2026 Agency supports and can accommodate Explanation: NYCHA will continue to use our TSAP system to notify applicants who have applied for public housing at one of the developments
    2. Published June 30, 2026 Agency supports and can accommodate Explanation: NYCHA will continue to use our TSAP system to notify applicants who have applied for public housing at one of the developments This answer reads the same as the one published May 12, 2026.
Show fewer agencies

Source: New York City Office of Management and Budget, Register of Community Board Budget Requests. Read September 7, 2026. Open the published register

Land use projects in this district

4 land use projects are recorded in community district Q01.

This is where each application is recorded. It does not mean this board held a hearing on it, made a recommendation about it, assigned it to a committee, or has any role in it.

Source: NYC Department of City Planning, Zoning Application Portal. Observed September 9, 2026. Open the published project source

Ways to participate

Current ways to enter this board’s public work, shown only when this board’s sources support them.

Board finances

Budget & spending Available fiscal facts

Money budgeted to and paid by this Community Board. Community District spending is a separate measure.

The available budget and payment facts are from different fiscal years and are shown separately.

Adopted budget
$341,878.00
FY2027
Payments posted through June 30, 2026
$41,556.28
FY2026 · 55 payments · 14 payees

Top payees

  • HARISCH STUDIO INC$11,921.00
  • THE VON AGENCY INC$9,250.00
  • GRM INFORMATION MANAGEMENT SERVICES INC$4,745.80
Sources and coverage

This card reports funds budgeted to and payments posted by this Community Board. Community District spending is a separate measure.

Citywide Payroll context

FY2025 staffing: 4 ACTIVE payroll rows; 0 non-ACTIVE published rows.

Counts are published payroll rows, not unique people. ACTIVE means leave status as of June 30 was ACTIVE.

ACTIVE title context

Payroll dollars

Regular gross paid
$205,163.01
Overtime paid
$0.00
Other pay
$0.00

Board totals across all published FY2025 rows, including non-ACTIVE rows. These Citywide Payroll pay fields are not an adopted budget, personnel budget, registered-contract value, posted payment total, or unique-person compensation total.

Source and field meanings

NYC Office of Payroll Administration · Citywide Payroll Data · source vintage 2026-04-16.

Regular gross paid is the amount paid for base salary during the fiscal year. Overtime paid is total overtime pay. Other pay includes additional compensation such as differentials, lump sums, allowances, retroactive pay, settlements, and bonuses when applicable.

Open the official Citywide Payroll source

Governing bylaws

Material board rules are shown only when that board’s governing source establishes them.

Can public committee members vote here?Source does not establish

No board-specific bylaw version is available in the checked sources.

Not yet established from checked sources: committees, people, and matters & actions.

Upcoming & recent proceedings (Records not shown)

Sources & coverage (Available: 2 records)

Latest minutes June 16, 2026

Open minutes or records

Connected civic objects

Back to Sources & coverage

Local connections

Nearby board connections

2 connected records.

  1. District coverage
  2. Sources & coverage

Official documents